Furuno CSH-24F User Manual Page 13

  • Download
  • Add to my manuals
  • Print
  • Page
    / 98
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 12
8
Installing stays (anti-vibration
measure)
Install stays from the top of the hull unit to
the ship’s hull. The stays should be angle
iron with a size of 75 x 75 x 9 mm or more
and at least two pieces should be used; one
each to ship’s bow and stern directions. In-
stall if possible, two more stays in ship’s
transverse direction.
Do not install the stays as shown below. Vibration-resistance effect is reduced since vibration is
applied to the stays as rotation force. Install them horizontally.
Figure 3-8 Proper and wrong installation of stay
Fastening receiver unit to hull unit
Fasten the receiver unit to the left side of the hull unit
as shown at right.
A transducer cable protection cover has been fitted
where the receiver unit is to be fastened to the hull unit.
Remove it when mounting the receiver unit.
Raise/Lower
Control Box
(Attached at
factory)
Receiver
Unit
Figure 3-7 Proper installation of stays
90°
Proper installation
Figure 3-9 Mounting of receiver unit
Page view 12
1 2 ... 8 9 10 11 12 13 14 15 16 17 18 ... 97 98

Comments to this Manuals

No comments